Dogpatch's Waterfront Pipeline, Sorted by What You Can Buy

Pier 70 covers 28 acres, and its most finished building is a football-field-sized former shipbuilding site. Building 12 reopened after rehabilitation in January 2022. It has a ground-floor market hall, maker studios on the second floor and offices on the third, and the Port of San Francisco reported it nearly 90% leased this August. Its tenants include Standard Deviant, Breadbelly, Sven Ceramics, The Plenary, Marbled Mint and Scuderia, the motorcycle dealer that has been in San Francisco for 30 years. Two venture capital firms have signed leases for the whole third floor. Bay Padel's three indoor courts are inside, and in July the San Francisco Chronicle reported the company was pouring concrete on a former parking lot for seven more pickleball courts and four more padel courts.

Building 12 has no homes. It is a fair picture of where Dogpatch's two big waterfront projects stand this fall. Together, Pier 70 and the Potrero Power Station, now branded the Dogpatch Power Station, are planned for several thousand new homes. Every residential building the Power Station has published is a rental, and Pier 70's first housing project is an apartment building. For a buyer looking at Dogpatch, the first new homes on the waterfront will be rentals, and the projects will bring renters, research space and parks to the neighborhood while the condos and lofts already standing make up the for-sale market.

The Power Station lists every residential building as a rental

The Power Station cleared a city vote this fall. The Board of Supervisors gave final passage to an amended agreement for the site on October 6, 2026, and the mayor signed it on October 13 as Ordinance 208-26. "Greater flexibility gets buildings built," Enrique Landa, managing partner of the developer Fifth Space, formerly Associate Capital, told the Chronicle in July. The paper reported that the plan is still for roughly 2,600 homes.

The developer's project site shows how those homes arrive. The Sophie Maxwell Building, the first new structure on the site, has 105 workforce apartments for households earning between 50% and 110% of area median income, in layouts from studios to two bedrooms. It opened in October 2025, as the SF Standard reported that week, and the Chronicle put it at about 90% leased by July 2026.

The next building is 151 Humboldt Street on Block 8, a Foster + Partners waterfront tower facing downtown. In August the Chronicle reported that JPMorgan Chase had agreed to finance about $200 million of it and gave the count as 342 units, with construction expected to start this fall. The project site lists 151 Humboldt as 350 rental apartments, currently in design. Block 7, another Foster + Partners high-rise "just down the street" from both, is listed at 325 units, also rental.

So the residential lineup the developer has published adds up to roughly 780 apartments, and all of them are rentals. The financing follows the same pattern. The Chronicle described JPMorgan's loan as a bet on apartment construction returning to San Francisco, and it followed the Quincy in Central SoMa, one of the few large market-rate projects finished during the city's post-pandemic slowdown.

Pier 70 starts its housing with an apartment building

Pier 70 is the one megaproject with for-sale buildings in its first phase. Brookfield Properties told the Chronicle in July that Phase 1 now totals 700 homes: a 105-unit affordable building, two condo buildings with 245 units between them, and the rest in rental housing. The first building to break ground would be a 350-unit apartment building on Lot E2, possibly in 2027. A Port presentation to its Southern Advisory Committee in August targeted the fourth quarter of 2027 for groundbreaking on two Phase 1 buildings.

Brookfield is also proposing to add homes, taking the site from 2,150 to as many as 2,750, a change that still goes to the Port Commission and the Board of Supervisors. Tim Bacon, Brookfield's vice president of development, told the Chronicle that about 70 more units on Lot E2 move the apartment building from "right on the edge of penciling to something that is starting to make a lot more sense."

Housing on the site waits on that first market-rate building. The Port reported in August that the affordable building planned for Parcel C2A has not advanced since the city chose Young Community Developers, Chinatown Community Development Center and Catholic Charities to build it in 2021, because the funding it depends on comes from market-rate development that has not happened yet. Brookfield has not yet exercised its option on any Phase 1 parcel. Neighborhood groups are watching the order of construction. J.R. Eppler of the Potrero Boosters told the Chronicle he wants affordable housing "delivered in each phase where other residential is delivered." Donovan Lacy of the Dogpatch Neighborhood Association said "the neighborhood doesn't want to wait another decade" for residential construction.

Clinics, offices and a park are on the schedule too

The housing is only part of the plan. Around an existing Dogpatch home, the larger changes on the published schedules are a medical and research campus, offices and a waterfront park.

UCSF's Clinical and Life Sciences Building is under construction at the Power Station, with a foundation poured more than 65 feet below ground. The Chronicle reported it is expected to open in phases beginning in 2028, with clinical care, research space, a life sciences incubator and a proton beam therapy center. Station A, the early-1900s power plant being converted rather than demolished, is entitled for 520,000 square feet of office and R&D space. Two Herzog & de Meuron buildings at 200 and 300 23rd Street are planned for another 515,000 square feet of office, lab and production space between them.

Open space is the other early piece. Fifth Space has planned Prequel Park, an interim waterfront park of about two and a half acres designed with Heatherwick Studio, on a stretch of shoreline that has been closed to the public for more than 160 years. When the Chronicle first reported the plan in 2025, it described the plan as a gallery inside the stack, a quarter-mile running track, a sports court and a 100-person amphitheater, built on land approved for a hotel that might be a decade away. Pier 70's Phase 1 parks work differently. The Port has scheduled them to be built along with the adjacent buildings, so they move on the housing's timeline.

Reading a Dogpatch listing against this pipeline

For a buyer, the main takeaway is about supply. Until Pier 70's 245 condos go up, the ownership market in Dogpatch is the stock that already exists: converted lofts, the smaller condo buildings off Third Street, and the few newer complexes. Take 950 Tennessee, the roughly 100-unit building that Oryx Partners and Handel Architects finished in 2020 across Minnesota Street from Esprit Park. Recorded sales show four resales there between January 1 and October 15, 2026, and all four went into contract within two weeks. No new for-sale tower on the waterfront has broken ground to compete with a building like that.

The citywide condo market also points this way. In a November 9 report on AI-company IPOs, the Chronicle quoted a San Francisco agent saying her team has seen more people buying condos and smaller single-family homes because they fear losing their foothold once companies like Anthropic go public. In Dogpatch, where the new buildings named so far are mostly rentals, that kind of demand has few new for-sale units to go to.

The rental-heavy pipeline matters to a buyer who might rent a unit out someday. The Power Station's published lineup comes to roughly 780 apartments, the 105 at Sophie Maxwell included, and Pier 70's Lot E2 would add another 350. If you live in the unit, the same buildings will bring more neighbors, along with the ground-floor retail and parks the developers have tied to them.

For buyers comparing Dogpatch with Mission Bay or Potrero Hill, ask each listing a specific question: which block is it on, and which parcel is next to it? The Power Station fronts Illinois Street between 22nd and 23rd, and Pier 70's new streets run from 20th Street to 22nd, so a home near those blocks will be closer to the construction than one several streets west.

Questions buyers ask about the waterfront projects

Will any Power Station homes be sold as condos? Every residential building the developer has published, including the Sophie Maxwell Building, 151 Humboldt and Block 7, is listed as a rental.

Where do Pier 70's condos stand? Phase 1 includes two condo buildings with 245 units between them. Brookfield's first housing project is the Lot E2 apartment building, with a possible 2027 groundbreaking.

What can I visit there today? At Pier 70, Building 12 has Breadbelly, Standard Deviant and Bay Padel's indoor courts.

If you are weighing a Dogpatch condo or loft and want to talk through what is planned near it before you write an offer, schedule a free consultation with David Poulsen. If you already own in Dogpatch, you can start with a home valuation.

Work With Us

Whether you're buying, selling, or investing, David offers strategic insight, local expertise, and unmatched client care. Reach out today to begin your San Francisco real estate journey.

Follow Me on Instagram